BONTRUP PEARL
BWTS system installation. Electrical and steel works were performed during the continuous operation of the ship.
BWTS system installation. Electrical and steel works were performed during the continuous operation of the ship.
Modernization of the existing ERMA FIRST's BWTS electrical installation. The works were carried out under the continuous operation of the ship in the North Sea. We have performed a full range of works, i.e. removal of the existing electrical installation, removal and securing of electrical switchboards and partial removal of cable trays. The installation stage…
Installation of the BWTS system and modernization of control consoles. Comprehensive work performed along with the delivery of materials.
Scope of work on the vessel included the removal of damages caused by the fire of one of the generating sets. Following systems were affected by the fire: control switchboards and cables of the generating set engine, generator cables of the neighboring generating set, cable trays in the vicinity of the generating set along with…