ATLANTIC TWIN
Installation of the BWTS system and modernization of control consoles. Comprehensive work performed along with the delivery of materials.
Installation of the BWTS system and modernization of control consoles. Comprehensive work performed along with the delivery of materials.
Scope of work on the vessel included the removal of damages caused by the fire of one of the generating sets. Following systems were affected by the fire: control switchboards and cables of the generating set engine, generator cables of the neighboring generating set, cable trays in the vicinity of the generating set along with…
Installation of the new main engine with the SCR system. The works included the removal of the part of the old main engine cables and installation of the new cables to the extent necessary for the proper functioning of the engine. The new ABC engine control system has been integrated into Noris, existing, first generation…